Skip To Main Content

Arrowhead Elementary Replacement

Milestones


  • Original Building Opened: September 1965
  • Groundbreaking: June 23, 2003
  • Building Dedicated: October 20, 2005

Building Facts


  • Student Capacity: 594
  • Building Size: 79,480 sq. ft.
  • Cost: $11 million
  • Architect: Folck West & Savage
  • Contractor: Conrad Brothers, Inc
  •  

Construction Highlights


  • Interior courtyard, which lets light into the commons area, media center and several classrooms in the school
  • Heavy landscaping on the school grounds
  • Nature trail that meanders through the wetlands and along the eastern branch of the Elizabeth River
  • Lobby complete with security desk and the latest closed circuit television system
  • Health clinic is connected to the main administrative suite
  • Commons area wall is curved, allowing more space in the faculty dining area
  • Media center and computer lab are connected
  • All classrooms have ceiling mounted projectors and pull-down screens instead of TVs
  • School is equipped with an art room, music room and guidance suite

Special Note


  • One of 14 protype elementary schools (Christopher Farms, Linkhorn Park, Seatack, New Castle, Bayside, Kempsville Meadows, Woodstock, Hermitage, Three Oaks, Brookwood, Windsor Woods, Arrowhead, Diamond Springs and Newtown
  • Other recreation features include a large map of the U.S. on an asphalt play area, playground equipment, a fenced-in primary play area, ball field and concession