Original Building Opened
1994 |
Addition Start Date
December 2005 |
Construction Completion
January 2007 |
Addition Dedication
May 30, 2007 |
Building Facts
| Student Capacity (with addition): |
2,403 |
| Building Size (with addition): |
330,525 sq. ft. |
| Project Cost: |
$4.2 million |
| Architect: |
Dills Ainscough Duff Architects |
| Contractor: |
Blueridge General, Inc. |
Building Improvements
- Construction of a twelve-classroom addition
- For a seamless transition the new addition matches the existing construction
- Improved facilities for the OLHS Math and Science Academy (science labs are located in the new addition)
- Improved student flow throughout the facility
- Improved instructional technology within the addition classrooms, as well as in the renovated areas inside the existing building
- Both the design and construction (total project delivery) was completed in less than 2 years.
|
|
|
|
|
|